Campbell, MN · BNSF Mainline Transload Facility

Rooted in Agriculture,Built for Rail and Transloading.

Grain, aggregates, pipe, dry bulk, project freight — if it moves by truck and belongs on rail, we make the connection. Bring us the transportation problem; we'll bring back a plan and a number.

54-Car Rail Siding · 24/7 Operations · Direct BNSF Mainline Access

What We Move

Six categories. One facility.
No handoff headaches.

Problem-Solvers First

Tight timeline, odd dimensions, no rail spur of your own — bring us the constraint. We built this operation around solving transportation problems, not just moving grain.

Cost-Effective by Design

One railcar carries roughly four truckloads. Transloading at Campbell puts rail's long-haul economics behind your freight while trucks handle only the short ends.

Safety, Every Shift

24/7 operations run on discipline: trained crews, maintained track, documented handoffs. The record your cargo — and your people — deserve.

54
Car rail siding
24/7
Operations
1M bu
Storage · 12 bins
75 mi
Truck draw radius
BNSF
Mainline direct
Did you know: one railcar ≈ four semi loadsCampbell sits directly on the BNSF main line — no shortline interchange
Shippers & Receivers

Your freight has a rail problem.
We're the fix.

Capacity crunches, lanes trucks can't price, product with no spur of its own — the BNSF main line runs right through Campbell, and our facility is the on-ramp. Tell us what needs to move and we'll engineer the transfer, the storage, and the last mile.

We started with area farmers, and we still move their grain every harvest. That same crew and track now serve pipeline, energy, construction, and industrial shippers across the BNSF network.

Request a Quote
Client access is invitation-only

Why Rail Through Campbell

1 railcar ≈ 4 trucks
Long-haul economics your lanes have been missing
National reach
Direct BNSF mainline access — no shortline interchange
Full transparency